• North Carolina Department of Transportation

    Site Information Form

    North Carolina NEVI Program
    • Applicants may complete MULTIPLE Site Information Forms for NCDOT NEVI RFP Round II.
    • Applicants should complete all information.
    • An "Applicant ID" is required in order to submit this form, and is provided after submission of the Team Information Form. However, an Applicant ID is not needed in order to enter data into this form and save progress.
    • If you have any additional questions, please contact ncnevi@NCDOT.gov.

    Note: You may save your progress using the "Save" button at the bottom of each page. You will be emailed a link to resume your application form later. We recommend saving your progress regularly to avoid losing input.

  • 1. Proposed Site Location Details

  • 1.2 Cluster name:
  • Note: The coordinates below shall indicate the location of the driving point of entry (curb cut) to the charging station, as defined in 23 CFR 680.104

  • 2. EVSE Technical Requirements

  • 2.1 Provide specification cut sheets for EVSE that clearly identifies the following information per port:

    • Power
    • Output current
    • Output voltage
    • Ambient operating temperature
    • Enclosure environmental rating
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 2.2 Provide a diagram of the proposed EV charging equipment and electrical connections including equipment power and/or energy ratings, as applicable. Include the utility transformer, charging cabinet(s), dispensers, connectors, batteries, solar panel(s), and any other proposed electrical equipment in the diagram, as applicable.

    The diagram should clearly indicate any power sharing arrangement between ports such that the power available per port can be determined based on the number of ports in use. The definition of charger, charging port, and connector shall be as defined in 23 CFR 680.104.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 2.3(c) Confirm proposed EVSE is Build America, Buy America compliant, per requirements.

  • EVSE Build America, Buy America compliance:
  • 2.4(a) Confirm each 150 kW or higher direct current fast charging (DCFC) EVSE is capable of simultaneously providing at least 150kW per port (Applies to the four required ports; additional ports are addressed in Section 4.1).

  • 150kW per port capability:
  • 2.4(b) Confirm a minimum of 4 NACS connectors and 4 CCS1 connectors are provided, per requirements.

  • 4 NACS and 4 CCS minimum:
  • 2.5(a) Are you providing a Battery Energy Storage System?
  • 2.5(b) Is the battery shared among all ports?
  • 2.5(f) Does the above comply with Technical Requirement 2.9, as detailed in Attachment 1 – Technical Requirements?
  • 3. General Project Approach and Understanding

  • 3.1 Complete Attachment 5, Proposed Project Schedule, per the instructions provided within the attachment, and attach it to this application as a .xlsx file.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 4. EVSE and Utility Information

  • Rows
  • Complete Attachment 12, Completed Utility Data Request Form (with rate schedule included), per the instructions provided within the attachment, and attach it to this application.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 5. Approach to Site Requirements

  • 5.2 Do you plan to provide free Wi-Fi at the site?
  • 5.3 Are the proposed project site and proposed EVSE charging station owned and operated by the Applicant?
  • 6. Proposed Site Details, Design, and Layout

  • 6.1 Site Map (Preliminary site design and layout)

    • Describe the approach to each item in section 6 listed below.
    • Clearly identify each item within a preliminary site design and layout attached to this application.
    • The preliminary site design and layout must be clear, legible, and drawn to scale.
    • All items must be located on-site and under the control of the Applicant Team.
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 6.3(a) Vehicular access (must be identified on both area map and proposed layout):
  • 6.4(a) Site improvements required to meet compliance with requirements (civil site work such as paving, curb cuts, striping, walkways, ramps, etc.):
  • 6.5(a) EVSE designated charging spaces:
  • 6.6(a) ADA-compliant EV charging spaces:
  • 6.7(a) EV charge ports (using the definitions in 23 CFR 680.104):
  • Reference 23 CFR 680.104

  • 6.8(a) Electrical infrastructure (transformer, etc.):
  • 6.9(a) Lighting:
  • 6.10(a) Trash receptacles:
  • 6.11(a) On-site wayfinding signage:
  • 6.12(a) Signage at EVSE charging spaces:
  • 6.13(a) Physical protection (bollards, fencing, curbs, etc.):
  • 6.14(a) Emergency shut off for EVSE:
  • 6.15(a) Proposed site is located in a 100-year floodplain, according to the FEMA Flood Map Service Center:
  • The FEMA Flood Map Service Center floodplain map can be found here. This map has a 100-year floodplain layer.

  • 7. Area Map

  • 7.1 Area Map

    • Describe the approach to each item in section 7 below.

    • Attach an area map that clearly identifies each required item.

    • The area map must be clear, legible, and include a scale.

    • Show the site location in relation to the State Highway/Interstate.

    • Indicate the distance from the interchange to the site, as defined in the RFP.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 7.2(a) Vehicular access from AFC (must be identified on both area map and proposed layout):
  • 8. Primary Amenities

  • If included in the proposal, describe the approach to each item below and clearly identify each item in the preliminary site design and layout attached to this application.

    • Amenities must be on site and controlled by Applicant Team.
  • 8.1(a) Access to restroom:
  • 8.2(a) Access to food and drink:
  • 8.3(a) Retail/shopping on-site:
  • 8.4(a) Canopy above chargers:
  • 8.5(a) Pull-through charger space(s) to accommodate vehicles pulling trailers:
  • 8.6(a) On-site staff:
  • 8.6(c) Will on-site staff be instructed in operation of EVSE?
  • 8.7(a) Energy storage:
  • 8.8(a) Future-proofing infrastructure:
  • Additional Attachments

  • Upload additional application Attachment files here.

    • Attachment 6 – Signed Cost Proposal Form
    • Attachment 7 – Signed Site Host Letter of Intent
    • Attachment 9 – Acknowledgement of FHWA Form 1273
    • Attachment 13 – Signed Certifications
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • 9. Site Responsiveness Check

  • Rows
  • 10. Technical Responsiveness Check

  • Rows
  • Rows
  • Rows
  • Should be Empty: